Case Study

エネルギー 治具検査 Project 006

A エネルギー case covering measurement planning, on-site capture, deviation analysis, and reporting for 航空機外板.

エネルギー治具検査2021静岡

Issue

The project required repeatable measurement of 航空機外板 under a short shutdown window, with clear reference points and acceptance criteria.

Scope

The team prepared a measurement plan, captured field data, compared results with CAD references, and organized deviation maps and inspection records.

Result

The project standardized evaluation criteria and created a dataset that can be compared in future inspections.