Case Study
自動車 3D計測 Project 071
A 自動車 case covering measurement planning, on-site capture, deviation analysis, and reporting for クリーンルーム搬送装置.
Issue
The project required repeatable measurement of クリーンルーム搬送装置 under a short shutdown window, with clear reference points and acceptance criteria.
Scope
The team prepared a measurement plan, captured field data, compared results with CAD references, and organized deviation maps and inspection records.
Result
The project standardized evaluation criteria and created a dataset that can be compared in future inspections.