Case Study
鉄道 品質保証 Project 093
A 鉄道 case covering measurement planning, on-site capture, deviation analysis, and reporting for 自動倉庫レール.
Issue
The project required repeatable measurement of 自動倉庫レール under a short shutdown window, with clear reference points and acceptance criteria.
Scope
The team prepared a measurement plan, captured field data, compared results with CAD references, and organized deviation maps and inspection records.
Result
The project standardized evaluation criteria and created a dataset that can be compared in future inspections.